Table 1 Initial Trasis Unidose® IQ/OQ/PQ

From: Have you looked for “stranger things” in your automated PET dose dispensing system? A process and operators qualification scheme

IQ OQ PQ
• Setup check-list
• Network configuration
• Trainings
• Labels data consistency
• Air bubble size
• Cartridge closure
• Requested activity vs filled activity precision
• Internal dose calibrators
• precision vs external calibrated dose calibrator
• Particular qualification
• Microbiological qualification (externalized)
• External dose rate
• PC/Unidose bridge
  1. Legend: This table provides summarized data about installation qualification (IQ), operational qualification (OQ) and performance qualification (PQ) initially performed by the supplier.